Managed repair workflow software for roofing claims.
Assign roof losses, manage vetted contractor networks, track documentation and supplements, monitor SLAs, and build clean closeout packages from one carrier-to-contractor workflow.
The managed-repair gap shows up in visibility, documentation, and cycle time
Most carriers still coordinate roof losses through contractor lists, spreadsheets, inboxes, and disconnected status updates. PerilBridge gives claim teams a structured operating layer for roofing repair work.
Without PerilBridge
- Ad-hoc contractor sourcing after every CAT event
- Incomplete photo documentation and supplement context
- Limited visibility into credential status, capacity, and work quality
- Manual follow-up across assignment, production, and closeout milestones
With PerilBridge
- Vetted roofing contractor networks organized by territory and peril
- Standardized claim documentation and supplement tracking
- Credential, capacity, SLA, and performance visibility in one workflow
- Assignment-to-closeout audit trails for claims and vendor teams
Five-layer vetting pipeline
Every contractor in the PerilBridge network passes a multi-source verification pipeline before they receive their first dispatch.
State License
Verified against state contractor licensing databases
Source: State licensing boards
HAAG Certified
Residential or commercial roof inspection certification
Source: HAAG Engineering
GAF / Owens Corning
Factory-certified installer or preferred contractor status
Source: Manufacturer programs
COI + WC Verified
General liability, workers' compensation, and additional insured requirements
Source: Carrier certificates + broker verification
Xactimate Proficient
Demonstrated Xactimate estimating and supplement capability
Source: Skill assessment + work samples
CAT dispatch SLA commitments
When a catastrophe event hits, PerilBridge helps claims and vendor teams track acknowledgment, response, mobilization, and work-start milestones across surge contractor capacity.
| Milestone | SLA |
|---|---|
Acknowledge Dispatch notification received and confirmed by assigned contractor | 15 minutes |
Initial Response On-site assessment or virtual inspection initiated | 4 hours |
Crew Mobilization Crew and materials staged for repair work | 24 hours |
Work Start Physical repair work begins at the property | 48 hours |
Contractor scorecards for claims and vendor management teams
Every contractor in the network has a live scorecard tracking certification status, response timing, documentation quality, supplement activity, closeout completeness, and compliance signals.
- Certification expiry monitoring
- Response and cycle-time trends by peril type
- Supplement-to-estimate ratio tracking
- Closeout completeness and reopen indicators
Contractor Scorecard Preview
Interactive scorecard — coming soon
Compliance-first network design
Every PerilBridge contractor operates under compliance guardrails designed to protect carriers, adjusters, and policyholders.
AOB Protection
Assignment of Benefits is never required. PerilBridge contractors work directly under the carrier's program — no AOB exposure for policyholders.
Deductible-Waiver Prohibition
All network contractors are contractually prohibited from offering deductible waivers, rebates, or incentives that violate state insurance regulations.
State License Compliance
Active contractor licenses verified against each state's licensing board. Automatic alerts for pending expirations or disciplinary actions.
Integrates with your claim management stack
PerilBridge works around your claim, estimating, and reporting systems, so teams can improve roofing claim visibility without replacing core platforms.
CSV / Flat File
Export contractor rosters, claim assignments, status history, supplement activity, and closeout reports in standard CSV format compatible with existing claim systems.
REST API
Programmatic access to assignment events, documentation status, supplement updates, and contractor scorecard data. Works around existing claim and estimating platforms.
Webhook Notifications
Real-time event notifications for assignment changes, SLA exceptions, supplement movement, documentation completion, and closeout confirmation.
What carriers are saying
“PerilBridge gives our CAT team one place to see assigned contractors, documentation status, and exception items after a hail event.”
Sarah M.
VP Claims, Regional Carrier
“The contractor scorecards give our claims and vendor teams a clearer view of documentation quality, responsiveness, and closeout consistency.”
David K.
Director of Vendor Management, MGA
“When supplement context, photos, and status notes are visible in the same workflow, our reviewers spend less time reconstructing the claim timeline.”
Lisa P.
CAT Team Lead, National Carrier
Frequently asked questions
Common questions from carrier partners evaluating PerilBridge.
How does PerilBridge vet contractors?
How does PerilBridge support CAT response SLAs?
How does integration work with our claim management system?
Do contractors carry sufficient insurance?
What does the contractor scorecard track?
How is PerilBridge different from a contractor marketplace?
Ready to modernize your managed repair program?
See how PerilBridge pre-positions vetted contractors in your peril zones, tracks SLAs in real time, and gives underwriting the data they need.