Skip to main content
PerilBridge

Managed repair workflow software for roofing claims.

Assign roof losses, manage vetted contractor networks, track documentation and supplements, monitor SLAs, and build clean closeout packages from one carrier-to-contractor workflow.

The managed-repair gap shows up in visibility, documentation, and cycle time

Most carriers still coordinate roof losses through contractor lists, spreadsheets, inboxes, and disconnected status updates. PerilBridge gives claim teams a structured operating layer for roofing repair work.

Without PerilBridge

  • Ad-hoc contractor sourcing after every CAT event
  • Incomplete photo documentation and supplement context
  • Limited visibility into credential status, capacity, and work quality
  • Manual follow-up across assignment, production, and closeout milestones

With PerilBridge

  • Vetted roofing contractor networks organized by territory and peril
  • Standardized claim documentation and supplement tracking
  • Credential, capacity, SLA, and performance visibility in one workflow
  • Assignment-to-closeout audit trails for claims and vendor teams

Five-layer vetting pipeline

Every contractor in the PerilBridge network passes a multi-source verification pipeline before they receive their first dispatch.

State License

Verified against state contractor licensing databases

Source: State licensing boards

HAAG Certified

Residential or commercial roof inspection certification

Source: HAAG Engineering

GAF / Owens Corning

Factory-certified installer or preferred contractor status

Source: Manufacturer programs

COI + WC Verified

General liability, workers' compensation, and additional insured requirements

Source: Carrier certificates + broker verification

Xactimate Proficient

Demonstrated Xactimate estimating and supplement capability

Source: Skill assessment + work samples

CAT dispatch SLA commitments

When a catastrophe event hits, PerilBridge helps claims and vendor teams track acknowledgment, response, mobilization, and work-start milestones across surge contractor capacity.

MilestoneSLA
Acknowledge

Dispatch notification received and confirmed by assigned contractor

15 minutes
Initial Response

On-site assessment or virtual inspection initiated

4 hours
Crew Mobilization

Crew and materials staged for repair work

24 hours
Work Start

Physical repair work begins at the property

48 hours

Contractor scorecards for claims and vendor management teams

Every contractor in the network has a live scorecard tracking certification status, response timing, documentation quality, supplement activity, closeout completeness, and compliance signals.

  • Certification expiry monitoring
  • Response and cycle-time trends by peril type
  • Supplement-to-estimate ratio tracking
  • Closeout completeness and reopen indicators

Compliance-first network design

Every PerilBridge contractor operates under compliance guardrails designed to protect carriers, adjusters, and policyholders.

AOB Protection

Assignment of Benefits is never required. PerilBridge contractors work directly under the carrier's program — no AOB exposure for policyholders.

Deductible-Waiver Prohibition

All network contractors are contractually prohibited from offering deductible waivers, rebates, or incentives that violate state insurance regulations.

State License Compliance

Active contractor licenses verified against each state's licensing board. Automatic alerts for pending expirations or disciplinary actions.

Integrates with your claim management stack

PerilBridge works around your claim, estimating, and reporting systems, so teams can improve roofing claim visibility without replacing core platforms.

CSV / Flat File

Export contractor rosters, claim assignments, status history, supplement activity, and closeout reports in standard CSV format compatible with existing claim systems.

REST API

Programmatic access to assignment events, documentation status, supplement updates, and contractor scorecard data. Works around existing claim and estimating platforms.

Webhook Notifications

Real-time event notifications for assignment changes, SLA exceptions, supplement movement, documentation completion, and closeout confirmation.

What carriers are saying

PerilBridge gives our CAT team one place to see assigned contractors, documentation status, and exception items after a hail event.

Sarah M.

VP Claims, Regional Carrier

The contractor scorecards give our claims and vendor teams a clearer view of documentation quality, responsiveness, and closeout consistency.

David K.

Director of Vendor Management, MGA

When supplement context, photos, and status notes are visible in the same workflow, our reviewers spend less time reconstructing the claim timeline.

Lisa P.

CAT Team Lead, National Carrier

Frequently asked questions

Common questions from carrier partners evaluating PerilBridge.

Ready to modernize your managed repair program?

See how PerilBridge pre-positions vetted contractors in your peril zones, tracks SLAs in real time, and gives underwriting the data they need.